Do you have a question? We are here for you! +31 (0) 742 045 700 info@boarecycling.nl
NL

Safety comes first!

Ravago Arendonk
Hero image
Our largest PE recycling line in Europe is being replaced. Part of this installation consists of a foil shredder with a chain conveyor belt. This chain conveyor belt starts from below the floor level. Because this belt is automatically controlled from a level determination in the shredder, there was a great need for a safety system on top of the standard emergency stop pull cords.

A safety system which protects the operator should he be unable to operate the emergency stop pull cords. But also a safety system that does not disturb the normal operation of the installation and thus acts in the background. To meet this need, BOA delivered a PSS I-BOR 17 personal safety system and 12 sets of P-TAG.
Smooth installation and integration into our current system

Ravago Arendonk

alt
The reason we chose BOA has to do with several reasons. The performance level D and SIL 2 (redundant system), which indicates in time if only 1 of the 2 badges is worn, was one of the main reasons. Moreover, it is a Benelux company with a long history with Ravago Arendonk. We also expect good service should this prove necessary.

By a smooth installation and integration in our current system, taking into account a recycling line that was still running, BOA provided the perfect solution.

We are available for all your questions